PPE

by Jez Bond

Scaffolding has been erected to the inside of the building and also to the facade. The drainage for the toilets at lower ground floor level has almost been completed. The substation now has clear dates for installation and the steels are with the fabricators. We’re in PPE mode now (Personal Protection Equipment) – meaning that hard hats, steel toe capped boots and high vis jackets need to be worn at all times on site. Time to order a supply of appropriate footwear and additional hard hats for potential visitors – and to get the camera out again before too much more happens!